Data Center Construction Manager Jobs in Texas
Data Center Construction Manager jobs in Texas are concentrated in the hyperscale cloud infrastructure, colocation, and enterprise IT sectors, with demand at every level from site superintendent to senior program director. The Dallas-Fort Worth metroplex, San Antonio, and Houston account for the largest share of openings, anchored by major operators and tenants including Amazon Web Services, Google, and Switch. Critical systems commissioning, MEP coordination, and hyperscale ground-up construction are the most in-demand specialties across Texas projects right now. Find a role that fits below and apply directly.
Find JobsOverview
Showing 5 of 160+ Data Center Construction Manager jobs









Job Description
Essential Duties & Responsibilities
- Lead the data center project development and project management throughout the entire project life cycle.
- Coordinate and manage consultant activity during the entitlement and design development stage of projects. Commission reports (utility, wetlands, environmental, geotechnical) and access results as they relate to project development.
- Assist in the preparation of project business plans, including marketing strategy, budget, capital requirements and exit strategies.
- Assist in the preparation of pro-forma models for project financial analysis.
- Assist in development and execution of project Sustainability plans.
- Implement and report on project status on a daily basis.
- Manage entitlement requirements with the responsible public agencies. Maintain relationships and coordinate with responsible public agencies on entitlement related issues.
- Prepare development budgets and manage costs to remain within budget constraints. Also prepare and manage development and project schedules including negotiation and resolution of critical path conflicts.
- Help assure that the organization is in compliance with local, state and Federal laws and permits and perform other related duties as assigned
- Directly interface with construction general contractors throughout all phases: bidding, award, execution, and project closeout/punch list. Responsibilities include:
- Develop and implement RFP requirements for project bids and review bidders' qualifications, analyze and evaluate bids and negotiate contracts as required. Manage contracts and agreements and enforce provisions as necessary.
- Plan and schedule work over the course of one or several months; defines tasks, priorities and work schedules in order to meet overall objectives of broadly defined work assignments.
- Developing comprehensive construction project scopes and requests for proposals.
- Performing financial analysis of construction projects.
- Managing construction documents, including submittal reviews, RFIs, change orders, and invoicing.
- Implementing construction project quality control measures.
- Recording and reporting key construction metrics to team and management.
- Serving as a leader within internal and external teams.
Key Qualifications & Competencies
- Bachelor’s degree in construction management, engineering, architecture/planning, business or related field, or additional significant relevant working experience in lieu of degree.
- 10+ years of construction or development project management experience on mission-critical or technically complex commercial construction projects, including data centers or high-density MEP environments.
- Advanced knowledge of the data center development, design, and construction principles and practices.
- Intermediate experience of financial models to understand the financial feasibility of projects.
- Ability to interpret federal, state, and local ordinances, regulations and past approvals pertaining to the development of assets.
- Skilled in drafting agreements and editing legal documents related to design and construction.
- Ability to handle complete infrastructure development life cycle for multiple projects and deadlines and generate detail-oriented work-product.
- Skilled in developing, coordinating and maintaining project schedules.
- Skilled in developing and executing project level Sustainability plans, including comprehensive understanding of relevant data center sustainability metrics (e.g., PUE, WUE).
- Experience with project risk management and mitigation strategies.
- Self-starter and team-player with ability to identify problems and develop creative solutions in a fast-paced environment with limited supervision.
- Ability to communicate effectively orally and in writing with senior management, technical consultants, public agency staff, fellow employees, public officials and community members.
- Analytical ability to collect, evaluate, and analyze information to make decisions that affect the overall operations or results.
- Strong proficiency of computer software, including but not limited to, Microsoft Office Suite, Yardi, Primavera P6, Aconex.
- Candidates with any or all of the following background are strongly encouraged to apply:
- Advanced business, real estate, or other related degrees.
- Project management (PMP) or construction management (CCM) certifications.
- Experienced in hyperscale turn-key data center projects.
- Specific knowledge of the data center entitlement and permitting process a plus.
- Experienced in real estate development and/or finance.
- Cloud based project management software a plus (Procore, Autodesk Construction Cloud).
Data Center Years Experience Needed
- 5 Years
Driver’s License Requirement
Communication Skills
Physical Requirements and Work Environment
The work environment includes areas and temporary structures owned, leased, or controlled by third parties over which Overwatch may have limited or no control. Because the project remains under construction, certain areas of the site — including access routes, staging zones, and temporary structures — may not yet be fully ADA-compliant until construction is complete or those third-party areas are finalized.
Physical Requirements
- Must be able to walk, stand, stoop, twist, bend, and climb stairs or ladders for extended periods while navigating uneven, unpaved, or obstructed terrain.
- Must be able to lift, carry, push, or pull up to 50 pounds on an occasional basis.
- Must be able to drive between job sites and access all areas of an active construction zone, including raised platforms, scaffolding, and confined spaces.
- Must be able to tolerate exposure to outdoor weather conditions, dust, and construction-related noise, vibrations, and odors.
- Must be able to communicate effectively with contractors, engineers, and site personnel, and maintain situational awareness in high-activity environments.
- Personal protective equipment (PPE), including hard hats, safety vests, hearing protection, and steel-toe boots, is required.
- Must have sufficient visual acuity to read drawings, specifications, and safety signage, and to observe site activity.
Work Environment
Reasonable Accommodation
Benefits
OVERWATCH is committed to creating a diverse work environment and is proud to be an Equal Opportunity Employer. OVERWATCH considers candidates regardless of race, color, religion, sex, sexual orientation, gender identity, national origin, disability or veteran status.
See All 160+ Data Center Construction Manager Jobs in Texas
Find roles in Texas that match your experience and apply in just a few clicks.
Find JobsData Center Construction Manager Jobs by City in Texas
Where Texas roles are concentrated, by current openings.
Data Center Construction Manager Job Market in Texas
A snapshot from current Texas openings, updated as new roles post.
Who's Hiring
- Turner & Townsend Pty Limited30

- Sundt20

- Mortenson Construction17

- KALCON8

- TeamLINX8

Top Industries Hiring
- Consulting & Professional Services12
- Energy3
- Technology & Software2
- Staffing & Recruiting1
- Construction & Real Estate1
What Texas Employers Look For
The qualifications that appear most often in data center construction manager jobs across Texas.
- Bachelor's degree in construction management, civil engineering, or a related field required
- Seven or more years of mission-critical or data center construction experience preferred
- PMP or CCM certification strongly preferred by Texas-based project owners
- Demonstrated experience managing MEP systems, raised-floor environments, and critical power infrastructure
- Proficiency with construction management platforms such as Procore or Bluebeam
- Ability to manage multiple general contractors and subcontractors across large Texas campuses
Data Center Construction Manager Jobs in Texas: Frequently Asked Questions
How do you become a data center construction manager in Texas?
Most data center construction managers in Texas start with a bachelor's degree in construction management, mechanical engineering, or electrical engineering, then build experience on mission-critical or industrial projects. Texas does not require a state-specific license for construction managers, but many employers expect candidates to hold a Project Management Professional credential or a Certified Construction Manager designation from the Construction Management Association of America. Working up through superintendent or MEP coordinator roles on colocation or enterprise campus builds is the most direct path.
Which companies hire data center construction managers in Texas?
Texas data center construction manager roles are posted by Turner & Townsend Pty Limited, Sundt, and Mortenson Construction and others right now, based on current listings on Migrate Mate as of November 2026. Texas's concentration of hyperscale campuses and major colocation providers means that both owner-side and general-contractor-side openings appear regularly throughout the year.
Which Texas cities have the most data center construction manager jobs?
Dallas, Houston, and Amarillo have the most data center construction manager openings in Texas right now. The Dallas-Fort Worth corridor leads because it hosts one of the largest concentrations of hyperscale and colocation campuses in North America, while San Antonio's favorable power infrastructure and Houston's energy-sector enterprise demand keep both metros consistently active for mission-critical construction roles.
Are there remote data center construction manager jobs in Texas?
Yes, but they're rare. About 31% of data center construction manager openings tied to Texas are remote or hybrid as of November 2026, reflecting how hands-on the role is during active construction phases. The portions of the role most likely to allow remote flexibility include pre-construction planning, vendor coordination, and design-review stages before a project breaks ground.
How can I get hired as a data center construction manager in Texas with little or no experience?
The most realistic entry path is moving into data center work from an adjacent construction role, such as MEP project engineer, commercial construction superintendent, or industrial project coordinator. Large Texas general contractors like Austin Industries and Hensel Phelps regularly onboard project engineers and field engineers who then rotate onto mission-critical accounts. Earning an OSHA 30 certification, gaining Procore proficiency, and completing any critical facilities coursework through an industry group like AFCOM strengthens a resume considerably for Texas hiring managers evaluating candidates without direct data center experience.
Where can I find and apply to data center construction manager jobs in Texas?
You can find and apply to data center construction manager jobs in Texas on Migrate Mate, which lists current Texas openings across the Dallas-Fort Worth corridor, San Antonio, Houston, and other active markets. Find the roles that fit your experience and apply directly to the ones that match.
See All 160+ Data Center Construction Manager Jobs in Texas
Find roles in Texas that match your experience and apply in just a few clicks.
Find Jobs