Data Center Construction Jobs in New Hampshire
Data Center Construction jobs in New Hampshire are in active demand, concentrated in the technology infrastructure, utilities, and commercial real estate sectors, with openings at every level from trades and site supervision to senior project management. Most hiring is centered around Manchester, Nashua, and Concord, where employers such as Eversource Energy, BAE Systems, and Granite Telecommunications maintain a lasting presence and ongoing capital projects. The most sought-after specialties include electrical infrastructure installation, mechanical systems commissioning, and structural steel coordination. Find a role that fits below and apply directly.
Find Data Center Construction JobsOverview
Showing 5 of 55+ Data Center Construction jobs









Reporting to the Director of the NH Agricultural Experiment Station, the incumbent will be responsible for leading the research, teaching, and outreach mission of the UNH Fairchild Dairy Teaching and Research Center. The manager oversees, stewards, and directly participates in the farm’s operational, personnel, and financial activities to ensure timeliness and success of animal management and care, infrastructure soundness, and interpersonal interactions. The manager supervises the full-time farm staff and student employees; is the primary coordinator of research projects, teaching activities (with a particular focus on enabling success of the UNH CREAM program), and engagement events on the farm, working with faculty, extension professionals, and staff; and works with external vendors and partners critical to effective dairy farm operations. In collaboration with the UNH Farm Services unit, the manager will coordinate manure management and crop storage activities. Through thoughtful and responsible leadership that emphasizes high standards for human and animal safety, strong and respectful interpersonal relationships with internal and external partners, and cost-effective operational management, the manager leads UNH Fairchild Dairy Teaching and Research Center through a culture that enables research that supports tomorrow’s New Hampshire dairy industry, impactful hands-on education that empowers tomorrow’s food system workforce, and state and industry recognition that UNH is a key destination for dairy science knowledge and innovation.
Duties and Responsibilities
Leadership of operations and people
- Provide overall leadership of the facility and the many diverse groups of stakeholders (researchers, instructors, students, student workers, residents, visitors, internal and external vendors and partners) who use and support the facility to meet the research, teaching, and engagement missions of UNH.
- Ensure that there is a collegial, communications-driven, and supportive culture of work that ensures that all those who use and visit the facility are welcomed and productive.
- Supervise full time employees, student workers, and adjunct staff.
- Be an active participant in regular meetings with other farm managers.
- Work with the NHAES operations manager to oversee the facility’s budget and provide responsible fiscal leadership.
- Work with the NHAES Director to identify, plan, and execute strategic investments to ensure long-term sustainability of the facility and its operations.
Animal health and care
- Oversee the overall standards and protocols for animal care, healthcare, and data logging, ensuring that they follow industry best practices, align with UNH IACUC requirements and USDA requirements, and are coordinated with the UNH Attending Veterinarian.
- Identify and participate in continuing education of animal health and care and actively incorporate new knowledge and practices into the facility’s standard operating procedures.
- With the assistant manager, manage herd health and breeding.
- Provide training and instruction to staff, student workers, students, and others in identifying animal care issues and managing them.
- Ensure that veterinary supplies and records are regularly maintained, checked, ordered, and disposed of properly.
Farm operations
- Participate in daily facility cleaning and animal feeding and milking chores.
- Ensure effective milk and animal sales.
- Working with UNH Farm Services, ensure effective manure management.
- Working with UNH Farm Services, ensure effective seasonal delivery and storage of feed.
- Ensure that there are sufficient student and adjunct staff employees and student residents to ensure effective farm operations.
Equipment and facilities maintenance and repair
- Track and conduct preventative maintenance on farm machinery and infrastructure.
- Communicate and coordinate with internal (UNH Facilities, UNH Farm Services) partners and external vendors to ensure timely and effective repairs of facilities and equipment.
- Ensure that farm, office, and student living facilities meet safety, comfort, and presentability standards for employees; faculty, staff, and students; residents; and visitors.
Assisting with research and teaching activities
- Working with researchers to coordinate, set up, and facilitate research projects.
- Working with instructors to provide guest lectures, educational activities at the farm, and coordinating classes and student clubs.
- Engaging with faculty, staff, extension professionals, and NHAES staff to organize outreach events at the farm for external stakeholders and audiences.
Other duties
- Other related and relevant duties as assigned.
Requirements
Minimum Education & Experience
- Bachelor’s degree in animal science, dairy science, or a closely related field.
- 5+ years experience working on a dairy farm, with demonstrated progression in responsibility and leadership.
- 4+ years of supervisory and leadership experience
Preferred Qualifications
- Experience in advanced mechanical repairs and management.
- Experience with conducting or supporting agricultural research, including knowledge IACUC protocols.
- Experience in agricultural education and training.
- Knowledge and experience of overseeing building and other farm infrastructure construction and repair projects.
- Valid CDL.
Knowledge, Skills & Abilities:
- Excellent communication skills and a commitment to timely and effective communication among employees and stakeholders.
- Supervisory and leadership skills needed to hire, train, and retain full-time and student employees.
- Experience in managing interpersonal interactions and leading supportive and collegial working environments for employees of different experience levels and skillsets.
- Training and experience in animal care and health topics, including artificial insemination and breeding.
- Knowledge and repair experience in basic mechanics.
- Experience in operating farm equipment and machinery (including milking equipment, feeding equipment, and mini loader) and ability to train other workers.
- Experience using computers for managing animal information, employee record keeping, and payroll.
- Sufficient strength and physical dexterity to perform duties and responsibilities of this job including heavy work (lifting up to 50 pounds) with exposure to inclement weather conditions for prolonged periods of time.
- Ability to wear and use appropriate personal protection equipment as necessary.
- Commitment to building and maintaining a culture of shared responsibility, team-based success, and continuous improvement.
Applicant Instructions:
Applicants should be prepared to upload the following documents when applying online within the My Experience: Resume/CV section of the application: (Maximum of 5 Documents)
- Current resume that demonstrates skillsets and experience relevant to the position description.
- Cover letter that provides a vision for leading a teaching and research dairy farm at a land-grant university and examples of relevant skillsets and experiences that demonstrate a strong fit with the position.
- Names and contact information (verified email and/or phone number) of three references.
Applications that are missing any of the required items may not move forward for consideration. Additional uploaded documents not requested in the position announcement will not be reviewed.
Priority Review Deadline
Applications submitted prior to July 19, 2026.
FTE
Full-time, benefitted, salaried 1.0 FTE position.
Please be advised that this position is supported by external sponsor funding. As such, continued employment in this role is contingent upon the availability of those external funds. If, for any reason, the sponsor funding is reduced or discontinued, employment may be subject to modification or termination in accordance with applicable policies and procedures.
The University of New Hampshire is an R1 Carnegie classification research institution providing comprehensive, high-quality undergraduate and graduate programs of distinction. UNH is located in Durham on a 188-acre campus, 60 miles north of Boston and 8 miles from the Atlantic coast and is convenient to New Hampshire’s lakes and mountains. There is a student enrollment of 13,000 students, with a full-time faculty of over 600, offering 90 undergraduate and more than 70 graduate programs. The University actively promotes a dynamic learning environment in which qualified individuals of differing perspectives, life experiences, and cultural backgrounds pursue academic goals with mutual respect and shared inquiry.
EEO Statement
The University System of New Hampshire is an Equal Opportunity/Equal Access employer. The University System is committed to creating an environment that values and supports diversity and inclusiveness across our campus communities and encourages applications from qualified individuals who will help us achieve this mission. The University System prohibits discrimination on the basis of race, color, religion, sex, age, national origin, sexual orientation, gender identity or expression, disability, genetic information, veteran status, or marital status.
Compensation Pay Range:
$57,590.00 - $102,850.00The pay range for this position is listed above. Actual offer will be based on skills, qualifications, experience, and internal equity, in addition to relevant business considerations. More information on benefits can be found here: USNH Employee Benefits | Human Resources
Location:
DurhamSee All 55 Data Center Construction Jobs in New Hampshire
Find roles in New Hampshire that match your experience and apply in just a few clicks.
Find Data Center Construction JobsData Center Construction Jobs by City in New Hampshire
Where New Hampshire roles are concentrated, by current openings.
Data Center Construction Job Market in New Hampshire
A snapshot from current New Hampshire openings, updated as new roles post.
Who's Hiring
- Dartmouth Health8

- PetVet Care Centers7

- Concord Hospital6

- U-Haul3

- Saco Bay Orthopedic and Sports Physical Therapy3

Top Industries Hiring
- Healthcare & Medical Services20
- Consumer Goods3
- Education1
- Manufacturing1
- Telecommunications1
What New Hampshire Employers Look For
The qualifications that appear most often in data center construction jobs across New Hampshire.
- Active New Hampshire electrical or general contractor license issued by the NH Office of Licensed Technicians
- Demonstrated experience managing large-scale commercial or industrial construction projects
- Familiarity with critical facility standards such as BICSI or Uptime Institute guidelines
- Proficiency reading and interpreting mechanical, electrical, and plumbing construction drawings
- OSHA 30-hour construction safety certification or equivalent documented training
- Strong coordination skills working alongside general contractors, subcontractors, and commissioning teams
Data Center Construction Jobs in New Hampshire: Frequently Asked Questions
How do you become a data center construction in New Hampshire?
Most data center construction roles in New Hampshire require a relevant construction license through the New Hampshire Office of Licensed Technicians or the New Hampshire Electricians' Licensing Board, depending on the discipline. Candidates typically hold a degree or technical certificate in construction management, electrical engineering technology, or a related field. Completing an apprenticeship through the New Hampshire Building Trades Council and obtaining OSHA safety certifications strengthens your application considerably for licensed roles on critical-facility projects.
How much do data center constructions make in New Hampshire?
Data center constructions in New Hampshire earn a median of about $129,260 a year, based on May 2025 Bureau of Labor Statistics wage data, ranging from around $92,300 for the lowest 10% to over $202,820 for the top 10%. Pay rises with experience, specialty, and employer.
Which companies hire data center constructions in New Hampshire?
New Hampshire data center construction roles are posted by Dartmouth Health, PetVet Care Centers, and Concord Hospital and others right now, based on current listings on Migrate Mate as of July 2026. New Hampshire's growing technology corridor along the Route 3 and Interstate 93 corridors has attracted several national and regional construction firms that maintain long-term project pipelines in the state.
Which New Hampshire cities have the most data center construction jobs?
Concord, Nashua, and Manchester lead New Hampshire for data center construction openings. Manchester anchors the market as the state's largest city with the most concentrated commercial and technology development activity, while Nashua's proximity to the Massachusetts border draws firms with cross-regional project portfolios, and Concord's role as the state capital generates consistent demand from government-adjacent infrastructure and utilities expansion.
Are there remote data center construction jobs in New Hampshire?
Yes, but they're rare. Data center construction is fundamentally a hands-on, site-based field, so most roles require a physical presence on New Hampshire job sites throughout the build and commissioning phases. About 13% of data center construction openings tied to New Hampshire are remote or hybrid as of July 2026, and those positions are typically limited to project planning, estimating, and document control functions that do not require daily on-site attendance.
How can I get hired as a data center construction in New Hampshire with little or no experience?
The most realistic entry path is through a registered apprenticeship with the New Hampshire Building Trades Council, which connects candidates with local contractors running active data center projects in Manchester and Nashua. Entry-level site coordinator, field engineer, or construction assistant roles are common starting points, particularly with utilities and commercial construction firms that operate in the state. Completing an OSHA 10-hour construction course and pursuing an associate degree in construction technology from New Hampshire's community college system gives candidates a competitive edge over applicants with no credentials.
Where can I find and apply to data center construction jobs in New Hampshire?
You can find and apply to data center construction jobs in New Hampshire on Migrate Mate, which lists current openings from employers actively hiring in the state. Find roles that fit your experience and specialization below and apply directly to the employers posting them.
See All 55 Data Center Construction Jobs in New Hampshire
Find roles in New Hampshire that match your experience and apply in just a few clicks.
Find Data Center Construction Jobs